• Home
  • About us
    • Teams
    • About UK office
    • Working map
  • Projects
    • Completed Projects
    • On Going Projects
  • Our Clients/ Donors
  • Work with us
  • Gallery
  • Contact us

Our Completed projects

  • Waterasia
  • Preparation of River Basin Plans and Hydropower Development Master Plans and Strategic Environmental and Social Assessment Project (World Bank Credit No 4515-NP; H902-NP for IWRMP and Grant No. TF18570-NP for PSRSHDP) Singha Durbar, Kathmandu

Preparation of River Basin Plans and Hydropower Development Master Plans and Strategic Environmental and Social Assessment Project (World Bank Credit No 4515-NP; H902-NP for IWRMP and Grant No. TF18570-NP for PSRSHDP) Singha Durbar, Kathmandu

  • Singha Durbar, Kathmandu

  • 2018-08-01

  • 2021-07-30

Sponsored by Water and Energy Commission Secretariat (WECS), Government of Nepal (GON) & World Bank (WB)

The project aimed to prepare river basin plans and hydropower development master plans with a focus on strategic environmental and social assessment for the entire nation. The services provided by the experts encompassed a comprehensive review of available information on physiographic features, ground and surface water resources, climate, precipitation, and river flows, verifying the data for different river basins and sub-basins. In order to achieve project’s objectives, the team utilized advanced hydrological modeling tools, including the physically based distributed hydrological model MIKE SHE, the one-dimensional river flow simulation model MIKE 11, and the river basin modeling and planning tool MIKE HYDRO BASIN.

 

Contact links

  • 9851167342, 9808168201
  • Jawalakhel, Lalitpur
  • https://maps.app.goo.gl/htsptR3tMsiUFcHu5
  • waterasiainternational@gmail.com

Page menu

  • About us
  • Teams
  • Work with us
  • Our Clients/ Donors
  • Gallery

On Social Media

Copyright © 2023 Water Asia International By Miz